![Rail : River Parrett Bridge Ballast movement [Stockpiler]](https://www.coveya.co.uk/content/uploads/2020/05/Rail-mobile-27-march-2.jpg)
Call us now:
0800 915 9195
Arrange a call back
Rail : River Parrett Bridge Ballast movement [Stockpiler]
An innovative and efficient high throughput conveyor solution to lift a large amount of ballast from ground level to a raised railway line.
Read more![Rail : Network Rail platform extension project, Liverpool [EK 600]](https://www.coveya.co.uk/content/uploads/2020/04/2017-06-15-13.20.22.jpg)
Call us now:
0800 915 9195
Arrange a call back
Rail : Network Rail platform extension project, Liverpool [EK 600]
3 x Easikit™ 600 conveyors (6.4m each) with custom-made wheeled frames and a silenced generator were used for a platform upgrade at Lime Street Station.
Read more
Previous
What our customers say
Useful Articles
Read our tips, best practice advice, safety and operations guides and case studies.
Knowledge baseOur Guarantee
If our temporary conveyor system fails to provide real and identifiable project efficiencies, we’ll remove it and you won’t be charged.
Our service