Construction & Excavation : Terminal 2 Heathrow Airport [GP750]
Coveya were delighted to work with Thames Materials on a project based at Terminal 2, Heathrow Airport where we supplied 5 of our 15m GP750 conveyors for a six week hire.
Read moreDemolition: Listed Mill, Manchester [EK 600 & GP750]
Northbank Demolition removed the basement, ground floor and a further three floors and roof from the former listed mill leaving behind the four façade walls. With such a complex project within a constrained site, the Coveya EK600 and GP750 conveyor systems came into their own.
Read moreBasement Excavation : Claridges Basement Project, London [EK 450 & EK 600]
Coveya supplied Easikit 450 and Easikit 600 on hire for two years at Claridge's Hotel, London where the existing basement was being excavated to accommodate two new floors.
Read moreWater Treatment & Reservoir Maintenance: Thames Tideway Project [EK 600]
Coveya were asked to look at the feasibility of installing an Easikit 600 temporary conveyor solution to move backfill material from a river path to the newly constructed cofferdam in the river approx. 80metres.
Read moreBasement Excavation: Morley House, London [GP750]
Coveya installed a 20.0m GP750 conveyor which fed the material from the basement floor to the back of the lorry and was loaded by a 14-ton excavator supporting an interesting basement excavation project in London.
Read moreConstruction : Harley Street Demolition & Construction project [Bespoke Conveyor]
A bespoke conveyor system was designed and installed at a new clinic in Harley Street - the first proton beam therapy unit in London.
Read moreRecycling & Waste Management : Glastonbury Festival, Somerset [EK 900]
2,500 tons of rubbish following the Glastonbury Festival was sifted, sorted and recycled using 11 linked Easikit™ 900 conveyors equally a 110m network of conveyors.
Read moreRail : Network Rail platform extension project, Liverpool [EK 600]
3 x Easikit™ 600 conveyors (6.4m each) with custom-made wheeled frames and a silenced generator were used for a platform upgrade at Lime Street Station.
Read moreAgriculture : Greener Gardening Company Compost Processing [EK 900]
White Moss Horticulture needed a way to unpack the contents of approximately 2 million bags of compost and so an Easikit™ 900 conveyor angled from the ground to over the hopper came into its own.
Read moreGroundworks & Landscaping: Bath Royal United Hospital [EK 450]
The 9-metre modular Easikit conveyor then took the spoil up the 35-degree angle to a height of just over 5 metres. At the top of the hospital walkway, it fed directly into a 14-metre flat conveyor, which carried the spoil away from the site and discharged onto a pile, where the spoil was hauled away.
Read moreBasement Excavation : Moving materials made easy in confined spaces
Working closely with the basement construction contractors, we make basement excavations easier, ensuring that our conveyor belt systems are installed to suit the site requirements and enable other works to carry on around the bulk excavation of the basement.
Read moreBasement Excavation : Grade II listed conversion to hotel [Bespoke conveyor]
Coveya's bespoke modular solution protected the Grade II listed building, whilst enabling simple, effective materials movement offsite within a busy environment.
Read moreWhat our customers say
We’ve been using the conveyor for 3 or 4 months to remove any stone work and dwarf walls. It’s been absolutely brilliant. It’s saved me thousands of man-hours. There were 2000sqm of flooring to come out and basically I’d say it’s definitely the best thing we’ve ever had on this site. I’d highly recommend it for builders as well as demolition. It really is a good bit of kit.
Coveya are professional and courteous with quick reaction times and an excellent product. We have used Coveya for years and are seriously impressed by the ease of setup of their modular conveyor system in tight spaces. It's the first choice for our business.
Using the systems from Coveya is very effective, enabling us to produce rates of around 60tph which vastly speeds up our project time and reduces our programme.
Without the help of this conveyor system we wouldn’t have been able to get this reservoir roof reinstated with 750t of gravel
Coveya are a very professional & courteous company, who from start to finish, worked extremely hard to supply us with a bespoke conveyor & hopper for an aged trommel to bring it back to life. The end product was excellent and the after care service was second to none. We wouldn’t hesitate to use them again should the need arise.
We have been extremely pleased with the levels of service and support provided by Coveya. They have always gone that extra mile to deliver the right solution, first time.
Thank you very much for the prompt and professional response to our breakdown. The belt arrived yesterday morning as promised and we were back up and running before midday. Many thanks.
Coveya worked very closely with us on this project and their professionalism and speed of delivery really stood out. They didn’t just supply us, they partnered with us.
Always a pleasure to deal with Coveya Ltd. We usually have last minute demands and they always manage to deliver.
Very helpful, and equipment has served us well since installation without any issues.
Good bit of kit. Hopefully be in touch when we need more conveyors!
It was a fantastic conveyor system considering how far the waste had to travel and a great team effort by KCP and Coveya.
I am extremely delighted to recommend the exemplary quality services and products of Coveya. The professionals at this company provide us with prompt and efficient service and good affordable spares. You might find that compared to other providers in the market, the quality of services and pricing is among the best in the region. They provide a quick delivery on spares that have been ideal for our business.
Useful Articles
Read our tips, best practice advice, safety and operations guides and case studies.
Knowledge baseOur Guarantee
If our temporary conveyor system fails to provide real and identifiable project efficiencies, we’ll remove it and you won’t be charged.
Our service