- Volkan
- November 7, 2022
Superbloom Garden @ The Tower Of London [Tracked Stockpiler]
Coveya supply tracked Stockpiler for Queens Superbloom Garden Project ahead of Queens Platinum Jubilee
As 2022 is slowly drawing to a close, Coveya look back at the great projects we have had the privilege of being part of. One of our favourites and most honourable, we saw the Superbloom at the Tower of London come to life with the help of the Tracked Stockpiler, in celebration of her late Majesty the Queens Platinum Jubilee.
The Tracked Stockpiler was on hire for several months, in preparation for the Queens Platinum Jubilee. The Stockpiler transported 500 tons p/h of material to the moat that wrapped around the iconic Tower of London. The material was then to be sorted, ready to plant the Queens Superbloom Garden.
Coveya were thrilled and honoured to be part of such a historical project and occasion!
Coveya made a brief appearance on the big screen, on Channel 5 ‘Inside The Tower of London’ documentary. On episode 2 of the series, we see the early stages of project Superbloom come to life with the help of our trusted Tracked Stockpiler! An excellent docu-seris well worth the watch! If you haven’t had the chance to watch it already, head over to MY5 to catch up, or click here!
For more information on our range of conveyors for packaging, manufacturing & distribution call us on 0808 501 5763 or email sales@coveya.co.uk.