London basement and swimming pool dig: 4C Developments [Invader45 and EK450]
London basement swimming pool excavation using the Invader45 and EK450 conveyor systems
London basement and swimming pool dig: Invader45 and EK450
4C Developments London case study
Thanks to 4 C Projects and Kieran Lismore to assisting us with this fantastic footage of the conveyors in action on their swimming pool excavation in Putney – looking forward to assisting with future projects…
Swimming pool excavation in a rear garden. The excavated material had to be transported 52m and inclined into a grab area so that the muck-away lorry could remove the spoil from the property. The conveyors were installed down the side of the house and through the garden. This made the excavation process a simple 1 man job – only an excavator operator was required to load the conveyor run.