London basement and swimming pool dig: 4C Developments [Invader45 and EK450]

London basement and swimming pool dig: 4C Developments [Invader45 and EK450]

London basement swimming pool excavation using the Invader45 and EK450 conveyor systems

London basement and swimming pool dig: Invader45 and EK450

4C Developments London case study

 

Thanks to 4 C Projects and Kieran Lismore to assisting us with this fantastic footage of the conveyors in action on their swimming pool excavation in Putney – looking forward to assisting with future projects…

 

Swimming pool excavation in a rear garden. The excavated material had to be transported 52m and inclined into a grab area so that the muck-away lorry could remove the spoil from the property. The conveyors were installed down the side of the house and through the garden. This made the excavation process a simple 1 man job – only an excavator operator was required to load the conveyor run.

 

For more information on our products and services call us on 0800 915 9195 or email sales@coveya.co.uk.

article

Useful Articles

Read our tips, best practice advice, safety and operations guides and case studies.

Knowledge base
guarantee

Our Guarantee

If our temporary conveyor system fails to provide real and identifiable project efficiencies, we’ll remove it and you won’t be charged.

Our service